Building 217 Stonington
  Building 217 Stonington
March 13th - Trimming it out Durable Link to this entry

The trim work is moving along and should be done today, next comes the painters. The kitchen is on its way; the cabinets are due in the 26th and Stove the 28th. The dishwasher and hood are on order and should be close to the 1st. All in all things are moving along nicely.