Building 217 Stonington
  Building 217 Stonington
March 21st Painting Durable Link to this entry

Paint is flowing, 1st they sprayed a coat of white, which is what Pat is looking at. Then they went through and spotted the areas to touch up (Point Up) then Tuesday they sanded those down and today they start to paint in force. From what I understand it is ceilings, then trim, then walls.