Building 217 Stonington
  Building 217 Stonington
April 2 - Pedal to the Metal Durable Link to this entry

Things are coming together: The Geothermal systems is in place waiting for Power (which is due in Wednesday April 4th), kitchen is ready for stone (awaiting our decision), the Stove is idling in the master bedroom (all 350 lbs of it), the ceramics (mud room, Baths) work starts today, some paint touchup in desk area, the deck is starting, and they are laying out the driveway… Things are flying left and right!