Building 217 Stonington
  Building 217 Stonington
April 11th - Stone Work Durable Link to this entry

Dropped the Microwave off this AM for install and found the Stone Men installing counter tops, they look great! The tile man was finishing the remaining bathrooms after finishing the master (take a look at the tub area) on the right side click on it to get a BIG shot).

I will post Stone shots tonight.