Building 217 Stonington
  Building 217 Stonington
April 17th - Inside and Out Durable Link to this entry

Busy day inside and out. It started early for me, 6:30 I meet with the plumbers to set the big tub fixture, afterwards they set up the shower. Then the day started for the floor people who laid down the white oak floors. Meanwhile outside the bull dozer was cutting the finial driveway and laying down the base stone. The shots on 4/17 show my car sitting on the circle.